KLF-FK136
KADIVA
| Availability: | |
|---|---|
| Quantity: | |
Product Introduction
The KLF136 speed multiplier features a 1:2.28 ratio, handling 103 kW (140 Hp) at 540 rpm input. It delivers 799 N·m torque at 1231 rpm output, built with precision engineering for consistent performance. We offer flexible customization to meet your unique operational and installation requirements.
Technical Parameters
Our goal is to work closely with partners to help customers achieve greater success in multiple fields.
We collaborate with reliable logistics partners to provide efficient logistics and delivery services.
We provide comprehensive after-sales service, providing product return and exchange services.
We have a professional technical team that can provide technical consultation and support to customers.
We have advanced laboratory facilities and quality control systems to ensure product quality and compliance.
Our company is located in Xiaoshan District, Hangzhou City, Zhejiang Province, China. It takes less than 30 minutes to reach us from both the high-speed railway station and the airport. Please feel free to contact us to book a factory tour.
What is the material of the gears? Do you have any product dimension drawings?
Regarding the gear material: The housing of our gearboxes are made of high-quality cast iron, and the gears and shafts are made of 20CrMnTi which ensures excellent strength, durability and long service life for agricultural machinery applications.
About the dimension drawings: Yes, we have complete product dimension drawings and technical specifications. I will send the detailed drawing to you right away for your reference.
What is the warranty period for your gearboxes?
We offer a 12-month warranty for all our gearboxes. If there is any quality problem during the warranty period, we will provide replacement or compensation
Do you have your own factory?
Yes, we are a professional manufacturer of agricultural gearboxes with our own factory, and we have many years of production experience in the agricultural machinery industry.
What is the lead time?
The standard lead time is 40–50 days after receiving the deposit or payment confirmation.